Our
Project Reference
Our
Project
Reference
MSM Perai Berhad
Mechanical work: piping replacement & modification , valve, pressure safety valve servicing & calibration, tank cleaning
Petronas Chemicals Fertiliser Kedah
Petronas Gas Detector Calibration – 3 years ( 2021-2024)
UOP Honeywell Malaysia
Operation & Maintenance Waste Water Treatment Plant – 1 years (2022-2023)
Malaysia Automotive Lighting
Waste Water Treatment & Schedule Waste Monitoring – 1 years (2022-2023)
Molex Malaysia
Warehouse renovation. Involve civil constructions work
Optic Blazer
Septic Waste System monitoring & Maintenance – 1 years (2022-2023)
KIJ Ultra Supreme - TOYO Tire Taiping
Price agreement monthly latex tank cleaning. Compliance with ICOP 2010 working in confined space.
Aerospace Composite Malaysia
Piping replacement and modification work. Platform and steel modification work
Kurita water ( Ibiden Electronics)
Maintenance and servicing for WWTP including piping word, FRP work, scrubble servicing, tank replacement, NDT thickness, civii work, platform replacement & others.
KES Water Systems
Price agreement regeneration mixed bed column at Penang area.
JLL Project & Construction- Intel Kulim
Building maintenance work. Including repairing work inside production area
Molex (M) Sdn Bhd
Building maintenance, civil work repair, UPV DOSH renewal servicing work, piping modification work for Bomba pipeline, cooling tower pipeline, repair fencing, drain cover modification, sprinkler unit replacement, HDPE pipeline, Bomba pump repairing, PVC piping, CDA pipeline, scrubber repair work,
Petron Refining & Marketing (Bagan Luar Terminal)
Price Agreement. Cover all job scope maintenance. 2021-2023
Petron Refining & Marketing (Lumut POME Plant)
Mechanical work such as (piping modification, structure and platform modification, tank cleaning, package boiler repair work)
Petron Refining & Marketing (Kuantan Terminal)
New piping installation for product conversion.
Citaglobal-Sandhana- Malakoff Power Plant Port Dickson
Decontamination for piping, tank and sump it. Including pigging work from HRC (Ex Shell refinery) to Malakoff plant
TNB Power Plant-Putrajaya
Refurbish external diesel storage tank
Aerospace Composite Malaysia
Piping replacement work
Bbraun Medical
Performing tank repair work. Including civil work and FRP laminated
First Solar (M)
Performing piping replacement work, tank cleaning, scrubber cleaning and blower replacement work
Petronas Dagangan Berhad-Kerteh
Performing PTI/PTO registration for piping. Also performing piping maintenance work
Ace Gas (M) Sdn Bhd
Performing activated carbon replacement and vessel cleaning
Haemonetics
HDPE lining replacement for water tank
Petronas Chemicals Fertiliser Kedah
Petronas Gas Detector Calibration – 3 years ( 2021-2024)
UOP Honeywell Malaysia
Operation & Maintenance Waste Water Treatment Plant – 1 years (2021-2022)
Malaysia Automotive Lighting
Waste Water Treatment & Schedule Waste Monitoring – 1 years (2021-2022)
Intel KM8 Kulim Hi Tech
Decontamination for WWTP & UPW System. Production floor, ducting, chemical piping, sump it, trench
Optic Blazer
Septic Waste System monitoring & Maintenance – 1 years (2021-2022)
KIJ Ultra Supreme - TOYO Tire Taiping
Price agreement monthly latex tank cleaning. Compliance with ICOP 2010 working in confined space.
Panasonic (M) Kulim Hi-Tech
Decontamination for two production.
Kurita water ( Ibiden Electronics)
Maintenance and servicing for WWTP including piping word, FRP work, scrubble servicing, tank replacement, NDT thickness, civii work, platform replacement & others.
KES Water Systems
Price agreement regeneration mixed bed column at Penang area.
Techny Group - Intel KM8
Decontamination for Scrubber System, All production line, chemical supply system, Gas supply system, LPG supply system
Soon Soon Oilmills
Package boiler servicing for Annual DOSH Inspection. Calibrate all Pressure safety valve (PSV)
Appraisal Property Management-JLL Intel Penang & Kulim
Price agreement regeneration mixed bed column and membrane cleaning for Intel Kulim & Intel Penang
Appraisal Property Management-JLL Intel Penang & Kulim
Job covered: Building maintenance work, NDT testing, Air receiver servicing for DOSH annual inspection. WWTP & Water treatment work
Tialoc Malaysia Environment
Cover up maintenance work for Tialoc for Penang & kulim Hi Tech
Petron Refining & Marketing- Bagan Luar & Kuantan
Price agreement for Storage Tank cleaning, repair, inspection for Bagan Luar Terminal & Kuantan Terminal- Contract 2022-2024
Petron Refining & Marketing- Kuantan Terminal
Piping product fabrication & installation for Diesel Tank
IOI Acidchem Perai
Performing Oil storage tank cleaning with following ICOP 2010 working in confined space
K-Elite Construction- Infineon Kulim
Fabricate & Supply stainless steel storage tank
Malakoff Technical Solution- Cogen Toray Plant
Turn Around annual inspection from DOSH for units HRSG LP & HP, package boiler overhaul. Job covered: scaffolding erection, cleaning & service HRSG, steam drum & others, NDT inspection (UTTM, MPI, API510) for UPV units.
Showa Denko Malaysia
Performing NDT test, air receiver servicing & pressure safety valve calibration for DOSH annual inspection
TNB Power Plant-Pasir Gudang
Chemical storage tank repair and product transfer
TNB Power Plant-Gelugor Penang
Turbine hose testing and pressure safety valve servicing & calibration
Kurita Malaysia-Rohm Wako
Mechanical package for UPW & WWTP installation. Including all mover work, all type piping fabrication & installation, pipe rack fabrication, confined space work, equipment & instrument installation, Testing & commissioning
Revmax Engineering-Petronas Dagangan Berhad-Northen
Tank cleaning & servicing work. Including product transfer.
KHTP Sterilisation Services
Performing Hydrostatic test for UPV unit
Posco Malaysia-Port Klang
Refurbish of UPV vessel
N.U.R Generation Power Plant
HP drum HRSG 1.1 & HRSG 1.2 cyclone separator for dismantling works
Central Sugar Refinery-Kuala Nerang
Performing piping modification, fabrication & installation
Sustio Batu Kawan
Price agreement for DI Column
Teleflex Medical
Perform submission, NDT test, Dye pent, hydrostatic test & PSV calibration
Tialoc Malaysia Environment-Australia Project
Performing fabrication & installation for scrubber skid for Indonesia project. Job scope: Fabricate skid and full blasting painting, scrubber installation, Piping installation. equipment & instrument installation. testing & commissioning
Tialoc Malaysia Environment-Indonesia project
Performing fabrication & installation for scrubber skid for Indonesia project. Job scope: Fabricate skid and full blasting painting, scrubber installation, Piping installation. equipment & instrument installation. testing & commissioning
Petronas Chemicals Fertiliser Kedah
Price Agreement Portable Gas Detector Calibration- 3 years (2021- 2024)
Malaysia Automotive Lighting
Waste Water Treatment & Schedule Waste Monitoring – 1 year (2021-2022)
UOP Honeywell Malaysia
Operation & Maintenance Waste Water Treatment Plant – 1 years (2021-2022)
Malaysia Automotive Lighting
Waste Water Treatment & Schedule Waste Monitoring – 1 years (2021-2022)
Molex Malaysia
Local Exhaust Ventilation Monthly Inspection – 1 years (2021-2022)
Optic Blazer
Septic Waste System monitoring & Maintenance – 1 years (2021-2022)
KIJ Ultra Supreme - TOYO Tire Taiping
price agreement monthly latex tank cleaning. Compliance with ICOP 2010 working in confined space.
NGK spark Plug Malaysia
Ducting modification & cleaning
Kurita water ( Ibiden Electronics)
Maintenance and servicing for WWTP including piping word, FRP work, scrubble servicing, tank replacement, NDT thickness, civii work, platform replacement & others.
KES Water Systems
Price agreement regeneration mixed bed column at Penang area.
KIJ Ultra Supreme - Imperal garmen Ipoh
Decontamination & Decommissioning WWTP
Mushtari Maintenance
Petronas Dagangan Berhad tank survey & calibration
Shinryo Malaysia
NDT for package boiler (MPI, UTTM)
Malaysian NPK Fertilizer
Pressure safety Valve Calibration
Kurita Water (Ibiden Electronics)
Maintenance and servicing for WWTP including piping work, FRP work, scrubber servicing, tank replacement, NDT thickness, civil work, platform repalaement & others
Industrial Concrete Product (ICP)
Servicing and maintenance Air receiver tank for DOSH Inspection (NDT Thickness, Dye penetration crane hook, PSV calibration)
Petron Refining & Marketing Lumut POME Plant
Turn Around for Annual DOSH inspection (mechanical, package boiler servicing, piping, UPV & others)
Petron Refining & Marketing Lumut POME Plant
Maintenance & servicing mechanical work, piping, WWTP, scrubber & others
Petron Refining & Marketing- Bagan Luar Terminal
Price agreement yearly covered general maintenance (Mechanical, Electrical, Civil and others)
MSM Perai Berhad
Job covered NDT Thickness, piping replacement, steel repair work & others
Stream enviroment
Piping, ducting and waste collection system installation for ASPEN group Batu Kawan
Ivory Glove
LPG piping, water, air compressor piping installation for overall factory
Linde Malaysia
Piping & mechanical maintenance for gas plant at Penang, Kelantan and Terengganu
Petronas Dagangan Berhad – Northern Region
Supply & Deliver Hardware item – 3 years (2020-2023)
Intel Penang
Annual servicing for Air receiver tank and perform NDT testing
Molex Malaysia
BOMBA tank panel replacement
NUR Generation Power Plant
FRP tank repair & lamination
Idaman Pharma-Sungai Petani
Piping modification & installation
TOMOE Malaysia
Servicing Overhead crane annual inspection DOSH
Ametec Penang
Construction for schedule waste sump it and DOE registration
FGV Palm Oil Industries-BIO gas factory mercu Sabah
HDPE membrane repair
JINKO SOLAR
Performing reversed engineering for 66 units UPV for Jinko Plant. Job involve conversion GB code to ASME for following Malaysia Standard. Involve: Design calculation, NDT (PAUT,UTTM,PMI,MPI) and also PSV calibration
Kurita Water (Ibiden Electronics)
Maintenance and servicing for WWTP including piping work, FRP work, scrubber servicing, tank replacement, NDT thickness, civil work, platform replacement & others
Tialoc Malaysia- Osram Kulim
Maintenance and servicing kitchen
Industrial Concrete Product (ICP)
Servicing and maintenance Air receiver tank for DOSH Inspection (NDT Thickness, Dye penetration crane hook, PSV calibration)
Ibiden Electronics (M)
Performing scrubber servicing and painting
Jimah O & M Power Plant
EPCC for Gas Ammonia Detection System
Tialoc Malaysia- Hanhwa Q Cells
Scrubber servicing and maintenance
Nippon Elgalv Steel
Modification of filter press for WWTP
Petron Refinery & Marketing Lumut PME Plant
Turn Around (mechanical, package boiler servicing, UPV servicing for DOSH annual inspection, piping fabrication & installation & others)
KIJ Ultra Supreme - TOYO Tire Taiping
Monthly latex tank cleaning. Compliance with ICOP 2010 working in confined space
Petron Refinery & Marketing Lumut PME Plant
Maintenance & servicing mechanical work, piping, WWTP, scrubber & others
CNN Engineering- Petronas Dagangan Berhad Northen Region- Price Agreement
Mechanical work including valve servicing, piping work and others
Petron Refining & Marketing- Bagan Luar Terminal- Price Agreement
Price agreement yearly covered general maintenance (Mechanical, Electrical, Civil and others)
Optic Balzers
Price agreement for yearly desludging septic tank
Mushtari Maintenance- Petronas Dagangan Berhad- Northen Region
Supply of competent person for AGT/ES, Dye penetration, Magnetic Particle Inspection
Automotive Lighting
Price agreement for yearly IETS and schedule waste monitoring
TNB Repair & Maintenance- Prai Power Plant
EPCC for cooling fan cover design, fabrication and installation
KES Water Systems
Price agreement regeneration mixed bed column at Penang area.
Soon Soon Oilmill
Tubular scaffolding erection for maintenance job, package boiler servicing work, pressure safety valve (PSV) servicing and calibration
Donalson Filtration
NDT thickness and API510 verification for Donalson UPV units
Zastra- Prai Malakoff Power Plant
Perform resin replacement, rubber lining repair, spark test
MG Furniture
Yearly LEV monitoring
MSM Perai Berhad
Job covered piping modification and new installation, platform fabrication, modification, and new installation, mechanical work such as pump repair, hooper, valve. Also cover NDT work and tank cleaning work
Silterra (M) Sdn Bhd
Covered mechanical work, valve supply, piping replacement, tank cleaning, steel work repair and building maintenance work
Kurita Water- Panasonic Kulim
Price agreement for yearly maintenance reclaim system and chemical tank cleaning
Panasonic Kulim
Annual DOSH inspection- NDT thickness, pressure safety valve calibration (PSV), vessel inspection and cleaning and piping fabrication work
Power Wind Engineering- KOBE Manufacturing
Shutdown work, NDT thickness measurement, PSV calibration, Air receiver tank cleaning and DOSH annual inspection work
Darco Water System- Oncogen Manufacturing Bandar Enstek
Performing stainless steel piping for WWTP system overall. Job scope covered, fabrication, installation with completed WPS, WQT certification
Tialoc Malaysia-Osram Penang
HDPE lining replacement for water tank
Tialoc Malaysia- Jabil batu Kawan
To fabricate and install steel structure for motorcycle parking
TNB Repair & Maintenance- Perai Power Plant
Modification for UF filter
KES Water System
Price Agreement for regenaration for portable DI column for Penang customer
Penfibre Penang
Package boiler DOSH inspection
Smartrac Technology
Perform NDT test, PRV calibrate, dye penetration test & cleaning & paint air receiver tank
Teleplan
Motor & pump servicing
Darco Water System-NGO CHEW HONG OILS & FATS
Installation MS piping & wiring, PVC & steel platform
Kurita Water (B Braun Medical)
Yearly shutdown work. Including tank cleaning, piping replacement, valve servicing, scrubbe servicing and chemical cleaning
N.U.R Generation Power Plant
CCB ground floor chiller ducting leaks & AHU servicing works
B Braun Medical
Package boiler servicing for DOSH Annual inspection, NDT work such as thickness measurement, dye pen, API 510
5NPV
Package boiler servicing for DOSH Annual inspection
KNN Borsig Boiler- Toray Cogen Plant
Turn Around for DOSH Annual inspection – HP & LP HRSG boiler, mechanical, confined space, NDT & others
Ayamas Food Corporation
Annual DOSH Inspection. performing NDT and pressure safety valve calibration (PSV)
Central Sugars (Padang Terap)
Install, test & commissioning 45 unit of RO membranes
N.U.R Generation Power Plant
Demin tank labelling WTP building wall painting & fire reterdent door replacement
N.U.R Generation Power Plant
EPCC for mini Scrubber System for acid tank system
Petron Refining & Marketing Lumut PME Plant
EPCC for mini Scrubber System for acid tank system
Petron Refining & Marketing Lumut PME Plant
EPCC for mini Scrubber System for acid tank system
Kurita Water (Ibiden Electronics)
Yearly shutdown work. Including tank cleaning, piping replacement, valve servicing, scrubbe servicing and chemical cleaning
Kurita Water (Panasonic Kulim)
Yearly shutdown work. Including tank cleaning, piping replacement, valve servicing, scrubbe servicing and chemical cleaning
FGV Palm Industries
fabrication and piping installation for Teriang Bio diesel plant
Darco Water System- Sun Power Melaka
HDPE piping fabrication & installation
Aerospace composite Bukit Kayu Hitam
Piping modification & installation
Lembaga Kenaf & Tembakau Malaysia
Fabricate and install machine platform at USM Nibong Tebal
Petron Refinery & Marketing - Bagan Luar Terminal
Price agreement overall maintenance (2020-2023)
Petron Refinery & Marketing - Bagan Luar Terminal
Price agreement overall maintenance (2020-2023)
Petronas Dagangan Berhad – Northern Region
Supply & Deliver Hardware item – 3 years (2020-2023)
UOP Honeywell
EPCC Waste Water Treatment Mobile skid
KIJ Ultra Supreme - Pen Apperal
Decontamination & Decommissioning WWTP